Delivery Terms & Conditions
Delivery, Installation & Commissioning (UK Mainland Only) of larger Fume / Laminar Flow cabinets
1) Delivery, installation and commissioning will all take place at the time of delivery.
2) If installation and commissioning is required on a different day, then an extra charge will be incurred.
3) If cabinet is to be sited upstairs, Monmouth Scientific will not be responsible for the siting.
4) Installation will take the form of siting the cabinet only – should the options be specified, installation does not include connection to gas, water or drains.
5) Power is by way of standard 13amp 3-pin plug. Should this be required to be hard wired, then this must be carried out by the customer